GENERAL PROCUREMENT NOTICE
FEASIBILITY STUDIES AND DETAILED DESIGNS OF THE MULTINATIONAL BURUNDI/RWANDA KANYARU/AKANYARU BELT ROADS: NGOZI (MWUMBE) – NYAMURENZA – NTEGA – KIRUNDO (66 KM) / KANYARU BAS – NYARUTEJA – KIBIRIZI – GISAGARA – NYAMIYAGA (110 KM)
Sector: Transport
Project ID No: P-Z1-D00-064
Procurement Reference No: EAC/SRVS/23-24/053
- The East African Community (EAC) has applied for funding from the African Development Bank through the NEPAD Infrastructure Project Preparation Facility (NEPAD – IPPF) to finance the above road project’s preparation and it intends to apply part of the grant proceeds to eligible payment under the contracts for consultancy services. The services will include reviewing and updating any existing designs and carrying out full feasibility studies and detailed engineering designs for the road sections with no existing designs for the regional trunk roads linking the two East African Partner States (Burundi and Rwanda) through the Kanyaru Bas / Akanyaru Bas border post.
- The main objective of the study is to improve the transport infrastructure between the two countries with a view to supporting EAC regional integration and economic development. The services will be procured through a shortlist of eligible and qualified consulting firms in accordance with AfDB rules and procedures. Broadly, the proposed study will consist of the following components: -
- Conducting full Feasibility Studies, Environmental and Social Impact Assessment (ESIA) and preliminary designs for the entire road;
- Carrying out design reviews and detailed engineering designs to conform to the EAC standards;
- Preparation of tender documents for the most viable options chosen by the Client.
- PROJECT DESCRIPTION
The project will include the following components: -
- Burundi Section: the 66-km long Ngozi (Mwumbe) – Nyamurenza – Ntega – Kirundo road which branches from the Bujumbura – Bugarama – Ngozi – Gitega – Kobero road. It is a gravel surfaced road traversing rolling to hilly terrain and runs parallel to the Kanyaru River. In the lowlands the road crosses several swamps and gets submerged in the rainy seasons.
- Rwanda Section: it is 110 km long and commences at the Akanyaru Bas border post and traverses rolling to hilly terrain through the towns of Nyaruteja, Kibirizi, Gisagara and terminating at Nyamiyaga. It is a gravel surface road that also crosses swampy areas.
- Acquisition of the services of the Consultants will be in accordance with the procedures set out in the African Development Bank’s Procurement Policy Framework, dated October 2015, which is available on the website afdb.org . The Request for Expressions of Interest (EOIs) is expected to be available in May 2025.
- Interested bidders may obtain further information, and should confirm their interest, by contacting: -
SECRECTARY GENERAL
Attn: The Secretary to the Procurement Committee
East African Community
Afrika Mashariki Road/EAC Close,
P. O. Box 1096,
ARUSHA-TANZANIA
Tel: +255 27 2162100, Fax: +255 27 2162190
E-Mail: eacprocurement@eachq.org
Website: https//www.eac.int